Categories
API Plans

Plan 21

Description: Plan 21 is recirculation from pump discharge through an 1/8” minimum flow control orifice (when necessary), and seal flush cooler, then into the seal chamber. Objective: Cool the process in the seal chamber, improving lubricity and increasing the vapor margin. Reduce coking. Advantages: Provides cooling through a seal flush cooler. When used with a […]

Categories
API Plans

Plan 14

Description: Plan 14 is recirculation from pump discharge through a properly sized flow control orifice (when necessary), to the seal chamber and from the seal chamber through a properly sized flow control orifice (when necessary), to the pump suction. (A combination of Plan 11 and Plan 13) Objective: Remove seal generated heat and vent vertical […]

Categories
API Plans

Plan 13

Description: Plan 13 is recirculation from the seal chamber or gland through an 1/8” minimum flow control orifice (when necessary), back to the pump suction. Standard flush plan for vertical pumps. Objective: Remove seal generated heat and vent vertical pumps. Advantages: Used in applications where the seal chamber pressure is greater than suction pressure. Can […]

Categories
API Plans

Plan 01 & Plan 11

Description: Plan 01 is an integral recirculation from the pump discharge to the seal chamber. This is an internal version of Plan 11. Recommended for clean process only. Advantages: No exposed plumbing around pump. Reduces risk of freezing or polymerization of process. Not recommended for vertical pumps. Description: Plan 11 is recirculation from pump discharge […]

Categories
API Plans

Plan 03

Description: Plan 03 is a dead‐ended seal chamber with an open throat, tapered seal chamber and flow modifiers to generate product circulation. Objective: Dissipate seal generated heat, vent and drain the seal chamber, and aid in the removal of solids. Advantages: Little to no maintenance. Process solids will not collect as they do in a […]

Categories
API Plans

Plan 02

Description: Plan 02 is a dead‐ended seal chamber with no recirculation of flush fluid. Objective: Often used with a jacketed seal chamber to control temperature in high temperature processes. Use only when adequate vapor margin is present in the seal chamber. Advantages: Little to no maintenance. Process solids are not continuously introduced into seal chamber. […]

Categories
Installation Guides

FCA200-A

INSTALLATION and OPERATING INSTRUCTIONS Flow Control Unit for AIR or GAS

Categories
Installation Guides

Cartridge Seal Installation Guide

INSTALLATION INSTRUCTIONS for PUMPS and MIXERS These instructions are not for component type seals or seals that come pre-mounted on the shaft

Categories
Installation Guides

1200S Installation Guide

Single Split Seal

Categories
Installation Guides

Mechanical Seal Installation Instructions

INSTALLING A MECHANICAL SEAL IN A CENTRIFUGAL PUMP